logo

Egypt - Rural Electrification Project I

Sector: Manufacturing (Industrial) • Location: Egypt

Source: African Development Bank (AfDB)

Project

The present Rural Electrification Project I should enable the Government to correct the disparity in living conditions existing between population in the large metropolitan areas (mainly Cairo and Alexandria) and those in the poor urban centers (small towns) and rural areas (villages). It involves the expansion of electric power distribution and consumer service facilities supplying about 300,000

Project Information FAQ

Project Information

4 Q
The project “Egypt - Rural Electrification Project I” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present Rural Electrification Project I should enable the Government to correct the disparity in living conditions existing between population in the large metropolitan areas (mainly Cairo and Alexandria) and those in the poor urban centers (small towns) and rural areas (villages). It involves the expansion of electric power distribution and consumer service facilities supplying about 300,000 inhabitants in towns and villages of three rural zones in Egypt namely governorates of Beny Sweif, Kafr El Sheikh and El Beheira. It consists of: a) the erection of 1200 km of 11 KV and 380/220 volt overhead and underground distribution power lines and related equipment; b) the construction of 1000 power distribution kiosks type sub-stations and pole mounted transformers of sizes ranging from 25 to 250 KVA; c) the installation of 120,000 single phase meters and 2600 three phase meters; d) the engineering and supervision of execution.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data