Egypt - Shoubrah El Kheima Interconnexion Transmission System
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
This project focuses on the Shoubrah El-Kheima interconnection transmission system. It's part of the development program of the Egyptian Electricity Authority (EEA) for the production and transmission of electricity, in order to cope with the growing demand of subscribers at the industrial, commercial and domestic plan. It's also expected to restore and strengthen the Cairo area transportation net
- Sector
- Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT), Geothermal, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Egypt - Shoubrah El Kheima Interconnexion Transmission System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project focuses on the Shoubrah El-Kheima interconnection transmission system. It's part of the development program of the Egyptian Electricity Authority (EEA) for the production and transmission of electricity, in order to cope with the growing demand of subscribers at the industrial, commercial and domestic plan. It's also expected to restore and strengthen the Cairo area transportation network, improving the quality and reliability of the service. The project comprises the following components: A) Underground transportation, 220 Kv; B) Air transport, 220 and 500 Kv; C) substation installation, 220 Kv; D) substation installation, 500 Kv; E) Replacement of circuit breakers; F) Consultants services. |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT), Geothermal, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
