Egypt - Two Canals Studies
Sector: Water Supply and Storage • Location: Egypt
Source: African Development Bank (AfDB)
The present project which relates to the two Canals Studies aims to investigate the short and long-term effects of irrigation. These studies comprises two main components namely: (i) Ismailia Canal Rehabilitation phase II, (km 28- km 128): feasibility and detailed engineering design and preparation of tender documents. (ii) Dikhelia Port-Nobaria Canal Construction: feasibility and detailed enginee
- Sector
- Water Supply and Storage, Government, Raw Materials
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Egypt - Two Canals Studies
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project which relates to the two Canals Studies aims to investigate the short and long-term effects of irrigation. These studies comprises two main components namely: (i) Ismailia Canal Rehabilitation phase II, (km 28- km 128): feasibility and detailed engineering design and preparation of tender documents. (ii) Dikhelia Port-Nobaria Canal Construction: feasibility and detailed engineering design and preparation of tender documents. |
Original sector | Transport & Storage |
Budget |
Location
Country | Egypt |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Raw Materials |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
