Egypt- Scatec ASA | 1.1 GW solar photovoltaic (PV) power plant integrated with a 200 MWh battery energy storage system (BESS) project
Sector: Energy Storage • Location: Egypt
Source: African Development Bank (AfDB)
The project involves the design, construction, operation, and maintenance of a 1 GWac solar photovoltaic (PV) power plant, a 100 MWac/200 MWh battery energy storage system (BESS), and an associated high-voltage substation in Nagaa Hammadi, Egypt, with an estimated cost of USD 593.6 million. The project is a key component of Egypt’s Integrated Sustainable Energy Strategy 2035, which aims to transit
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the design, construction, operation, and maintenance of a 1 GWac solar photovoltaic (PV) power plant, a 100 MWac/200 MWh battery energy storage system (BESS), and an associated high-voltage substation in Nagaa Hammadi, Egypt, with an estimated cost of USD 593.6 million. The project is a key component of Egypt’s Integrated Sustainable Energy Strategy 2035, which aims to transition the country’s electricity sector—currently dominated by oil and gas—towards an energy mix comprising 42% renewable sources. By combining solar PV generation with the BESS, the project will deliver clean and dispatchable energy, helping to address intermittency challenges, improve grid stability, and support frequency regulation and voltage control. Financial close is expected in early June 2025, and the project will be implemented in two phases. Phase 1, comprising 500 MWac of solar PV and a 200 MWh BESS, is expected to reach commercial operation date (COD) in March 2026 after a nine-month construction period. Phase 2, consisting of the remaining 500 MWac, is expected to reach COD in September 2026. The entire project will be completed within 15 months from financial close. It is being implemented by Scatec and, once completed, will be the first large-scale independent power producer (IPP) solar project in the country to integrate a BESS. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |