The project involves the design, construction, operation, and maintenance of a 1 GWac solar photovoltaic (PV) power plant, a 100 MWac/200 MWh battery energy storage system (BESS), and an associated high-voltage substation in Nagaa Hammadi, Egypt, with an estimated cost of USD 593.6 million. The project is a key component of Egypt’s Integrated Sustainable Energy Strategy 2035, which aims to transit

Project Information FAQ

Project Information

4 Q
The project “Egypt- Scatec ASA | 1.1 GW solar photovoltaic (PV) power plant integrated with a 200 MWh battery energy storage system (BESS) project” is an infrastructure initiative in the Energy Storage sector, located in Egypt. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the design, construction, operation, and maintenance of a 1 GWac solar photovoltaic (PV) power plant, a 100 MWac/200 MWh battery energy storage system (BESS), and an associated high-voltage substation in Nagaa Hammadi, Egypt, with an estimated cost of USD 593.6 million. The project is a key component of Egypt’s Integrated Sustainable Energy Strategy 2035, which aims to transition the country’s electricity sector—currently dominated by oil and gas—towards an energy mix comprising 42% renewable sources. By combining solar PV generation with the BESS, the project will deliver clean and dispatchable energy, helping to address intermittency challenges, improve grid stability, and support frequency regulation and voltage control. Financial close is expected in early June 2025, and the project will be implemented in two phases. Phase 1, comprising 500 MWac of solar PV and a 200 MWh BESS, is expected to reach commercial operation date (COD) in March 2026 after a nine-month construction period. Phase 2, consisting of the remaining 500 MWac, is expected to reach COD in September 2026. The entire project will be completed within 15 months from financial close. It is being implemented by Scatec and, once completed, will be the first large-scale independent power producer (IPP) solar project in the country to integrate a BESS.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data