Egypt: Damietta Port - Container Terminal II
One of 5,002 projects Taiyo tracks in Egypt.
Source: Asian Infrastructure Investment Bank (AIIB)
The Project comprises the design, construction, and operation of CT II's superstructure, consisting of equipment (i.e., quay cranes, rubber-tyred gantry cranes, trucks) and facilities (i.e., pavement, electricity) at Damietta Port located in Egypt. Separate from, but related to the Project, the Damietta Port Authority (DPA) is responsible for the provision and financing of the infrastructure requi
- Status
- Prospective
- Sector
- Water Supply and Storage, Rail, Power Transmission, Automotive, Seaport, Consumer Products, Road, Power Generation (CCGT), Car parking, Education, Residential, Commercial, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Egypt: Damietta Port - Container Terminal II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project comprises the design, construction, and operation of CT II's superstructure, consisting of equipment (i.e., quay cranes, rubber-tyred gantry cranes, trucks) and facilities (i.e., pavement, electricity) at Damietta Port located in Egypt. Separate from, but related to the Project, the Damietta Port Authority (DPA) is responsible for the provision and financing of the infrastructure required for the terminal (including land excavation and foundation works, construction and maintenance of quay walls, dredging of the access channel and basin) and all utilities, access roads and rail tracks, up to the boundaries of CT II. These DPA activities are not financed by AIIB and are considered an associated facility out of the Borrower's control. The CA was signed on May 18, 2022. The Project revenues will be generated through the operations of CT II for a concession period of 30 years. |
Original sector | Transport |
Budget |
Location
Country | Egypt |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Power Transmission, Automotive, Seaport, Consumer Products, Road, Power Generation (CCGT), Car parking, Education, Residential, Commercial, Government |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
