logo
ProjectClosed

EGYPT-Farm-level Irrigation Modernization

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The development objective of the Farm-level Irrigation Modernization Project for the Egypt, Arab Republic (EFIMP) of is to increase agricultural profitability and improve equity in access to higher-quality water for up to 140,000 small-scale farmers on up to 200,000 feddans (80,000 hectares) in the command areas of Mahmoudia, Manaifa, and Meet Yazid located in the Nile Delta. There are two compone

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EGYPT-Farm-level Irrigation Modernization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EGYPT-Farm-level Irrigation Modernization” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Farm-level Irrigation Modernization Project for the Egypt, Arab Republic (EFIMP) of is to increase agricultural profitability and improve equity in access to higher-quality water for up to 140,000 small-scale farmers on up to 200,000 feddans (80,000 hectares) in the command areas of Mahmoudia, Manaifa, and Meet Yazid located in the Nile Delta. There are two components to the project. The first component of the project is marwa and farm-level irrigation improvements. This component supports marwa and farm-level irrigation modernization in the command areas of Mahmoudia, Manaifa and Meet Yazid. In these locations, branch canal and mesqa improvements have been carried out or are currently ongoing, and mesqa water user associations (WUAs) have been formed for sustainable operation and maintenance (O&M) and irrigation management. This component will provide financing for the following activities: (i) change of approximately 75 percent of the mesqa pump stations from diesel pumps to electric ones and installation of dedicated rural electric-power grids; (ii) farm-level improvements such as laser land-leveling, reshaping field drains, soil improvements, flexible hose systems, and gated pipes; (iii) support workshops for use and maintenance of mesqa and marwalevel works and land improvement activities; and (iv) field surveys, designs, and construction supervision and management. The second component of the project is farm-level technology modernization. This component aims to enhance farmer knowledge and uptake of improved irrigation and associated land improvement and crop production technologies in parallel with and in support of the marwa-level irrigation modernization carried out under component one. The component will include: (i) increasing farmer awareness of marwa improvements through farmer meetings and exchange visits; (ii) demonstrations of improved marwa and farm-level irrigation systems, improved on-farm water management, and associated land improvement and agronomic practices for both field crops and horticultural crops; (iii) implementation support, including pilots and studies to support development of future field-level irrigation improvement and monitoring and evaluation (M&E) activities; and (iv) environmental monitoring and mainstreaming.

Original sector

FY17 - Agriculture, Fishing and Forestry

Budget

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project