Egypt Green Hydrogen (EGH) 200 MW Wind Power Plant
Sector: Road
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering providing a loan for the construction, commissioning and operation of a 200 MW wind power project (WPP) in Egypt. The WPP will provide electricity to integrated green ammonia production facility consisting of a 100 MW electrolyser. Electricity will also be provided by a 70MW solar plant.
The ESIA disclosure package focuses on the WPP only. 1. ESIA Report 2. Stakeholder Eng
- Status
- Prospective
- Sector
- Road, Solar, Wind, Hydrogen, Power Generation (CCGT), Residential, Commercial, Government
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Egypt Green Hydrogen (EGH) 200 MW Wind Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The EBRD is considering providing a loan for the construction, commissioning and operation of a 200 MW wind power project (WPP) in Egypt. The WPP will provide electricity to integrated green ammonia production facility consisting of a 100 MW electrolyser. Electricity will also be provided by a 70MW solar plant. The ESIA disclosure package focuses on the WPP only. 1. ESIA Report 2. Stakeholder Engagement Plan 3. Non-Technical Summary (NTS) 4. Environmental and Social Action Plan (ESAP) 5. ESHS Manual 6. Cumulative Effects Assessment (CEA) Report 7. Critical Habitat Assessment (CHA) Report 8. Biodiversity Management Plan (BMP) 9. Biodiversity Action Plan (BAP) 10. Climate change risk assessment 11. Flood risk assessment 12. Migration of Soaring Birds at Gebel El Zeit (IBA) in relation to wind energy developments-SCATEC project 13. Gender and HR Risk Assessment 14. Detailed noise assessment (technical annex) 15. Shadow flicker assessment (technical annex) Download zip file of ESIA package in English Download zip file of ESIA package in Arabic ESAP: English | Arabic Full ESIA documentation is available locally at: Ras Ghareb Local Governmental Unit Ras Ghareb City Council Offices Al-Mina Street, 11432 Ras Ghareb – Red Sea, Egypt Tel: 01001318480 or 01201958777 And Project office: Building 44, The Northern 90th street, banks center, New Cairo, Cairo And EBRD Resident Office in Cairo EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo, Egypt https://scatec.com/sustainability/esg-resources/ Environmental or social enquiries Contact Name: Mohammed Khairy Email: mohammed.khairy@scatec.com Web: https://scatec.com/sustainability/esg-resources/ General enquiries Contact Name: Adam Marmoush Email: adam.marmoush@scatec.com Web: https://scatec.com/sustainability/esg-resources/ Contact Name: Raquel Araujo Email: raquel.araujo@scatec.com Web: https://scatec.com/sustainability/esg-resources/ |
Location
| Not available for this record. |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Wind, Hydrogen, Power Generation (CCGT), Residential, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
