logo
ProjectClosed

EGYPT-Integrated Irrigation Improvement and Management Project

One of 989 projects Taiyo tracks in Egypt, Arab Republic of.

Source: World Bank Group

The Integrated Irrigation Improvement and Management Project aims at assisting the Ministry of Water Resources and Irrigation (MWRI) in improving the management of irrigation and drainage in the project area, to increase the efficiency of irrigated agriculture water use and services. The project has the following five components: Component 1) will cover the implementation of irrigation and drainag

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Biomass, Consumer Products, Raw Materials, Waste Processing and Treatment, Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EGYPT-Integrated Irrigation Improvement and Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EGYPT-Integrated Irrigation Improvement and Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Integrated Irrigation Improvement and Management Project aims at assisting the Ministry of Water Resources and Irrigation (MWRI) in improving the management of irrigation and drainage in the project area, to increase the efficiency of irrigated agriculture water use and services. The project has the following five components: Component 1) will cover the implementation of irrigation and drainage rehabilitation, improvement and modernization works and programs at all levels of the selected command areas. Component 2) will cover: (i) regional water and land management adaptive research programs; (ii) extensive on-farm water control and irrigated agriculture practice demonstrations; and (iii) irrigation advisory and production support services strengthening. Component 3) establishment, expansion and scaling up of water user organization functions at the levels of tertiary and secondary system irrigation and drainage hydraulic units throughout the selected command areas. Component 4) will support the management and needed for effective planning, implementation coordination entities, functions and activities and eventual commissioning of irrigation and drainage improvements on the basis of full command areas. Component 5) A project Environmental Management Plan (EMP) will be implemented under this component to demonstrate how improvements in water quality can be achieved.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Biomass, Consumer Products, Raw Materials, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project