EHRM Infrastructure and Data Center Upgrades
Closed · Georgia · Last reported Sep 2025
Source: Dodge
The intent of this project includes but is not limited to completely preparing the site for building operations, including demolition and removal of existing structures, and furnishing labor and materials to perform work for the replacement of the main Data Center in Building 1. The main data center is to be relocated and brought into compliance with the OIT standards by upgrading fiber optic cabl
- Status
- Closed
- Sector
- Broadband, Data Center, Manufacturing (Industrial), Commercial, Telecommunications
- Location
- Decatur, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about EHRM Infrastructure and Data Center Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of this project includes but is not limited to completely preparing the site for building operations, including demolition and removal of existing structures, and furnishing labor and materials to perform work for the replacement of the main Data Center in Building 1. The main data center is to be relocated and brought into compliance with the OIT standards by upgrading fiber optic cables and reconfiguring it in a star topology where the Data Center in Building 1 serves as the cent... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Decatur |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Broadband, Data Center, Manufacturing (Industrial), Commercial, Telecommunications |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
