EHRM Infrastructure Upgrades
Sector: Consumer Products • Location: Orlando, Florida, United States of America
Source: Dodge USA
The Contractor shall correct the noted deficiencies and bring The Contractor shall correct the noted deficiencies and bring the entire campus up to the current standard as outlined and noted in the VA OI&T Infrastructure Standard for Telecommunication Spaces at the Orlando VA Medical Center Lakemont Campus, in Florida. Contractor shall completely prepare site for building operations, including dem
- Status
- Under Construction
- Sector
- Consumer Products, Telecommunications, Hospital, Hotel, Commercial
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EHRM Infrastructure Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall correct the noted deficiencies and bring The Contractor shall correct the noted deficiencies and bring the entire campus up to the current standard as outlined and noted in the VA OI&T Infrastructure Standard for Telecommunication Spaces at the Orlando VA Medical Center Lakemont Campus, in Florida. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Telecommunications, Hospital, Hotel, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
