EHRM Wan Path Upgrades SOLE SOURCE
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
To provide all labor, material, and equipment to remove, install, and replace the existing fiber cables, copper cables, and conduits for the EHRM Wide Area Network path upgrade project at the VA Puget Sound Health Care System VA Medical Center located in Seattle, WA.
- Status
- Closed
- Sector
- Metal, Hospital, Telecommunications, Commercial, Hotel, Manufacturing (Industrial)
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EHRM Wan Path Upgrades SOLE SOURCE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To provide all labor, material, and equipment to remove, install, and replace the existing fiber cables, copper cables, and conduits for the EHRM Wide Area Network path upgrade project at the VA Puget Sound Health Care System VA Medical Center located in Seattle, WA. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Hospital, Telecommunications, Commercial, Hotel, Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
