logo
ProjectUnder Construction

Eielson Air Force Base Advanced Nuclear Project

One of 10,000+ projects Taiyo tracks in Alaska.

Source: TradingView

An Aurora-derived project at Eielson Air Force Base in Alaska planned to deliver and meter at least 5 megawatts of electric power, primarily supplying steam for district heating. Site characterization is underway with ground investigations expected in summer 2026. The plant is described as a 60-megawatt thermal plant using the same fuel form and dimensions as other Oklo designs but with less fuel

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT), Government, Nuclear
Location
Alaska, United States of America
Updated
22 Jul 2026
Source
TradingView

ConstructChat

Ask ConstructChat about Eielson Air Force Base Advanced Nuclear Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Eielson Air Force Base Advanced Nuclear Project” is an infrastructure initiative in the Geothermal sector, located in Alaska, United States. Taiyo aggregates data on it from TradingView.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An Aurora-derived project at Eielson Air Force Base in Alaska planned to deliver and meter at least 5 megawatts of electric power, primarily supplying steam for district heating. Site characterization is underway with ground investigations expected in summer 2026. The plant is described as a 60-megawatt thermal plant using the same fuel form and dimensions as other Oklo designs but with less fuel and a smaller vessel and plant footprint.

Original sector

Energy

Location

Country

United States of America (USA)

State

Alaska

Source

Source

TradingView

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Government, Nuclear

Article published date

2026-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project