Eighth Avenue Bridge Modification over Burnham Yard
The owner, status and timeline of this project. A free account opens every field.
Source: BusinessDen
The project involves removing the eastern portion of the two-lane Eighth Avenue bridge over Burnham Yard and the RTD tracks, converting that section into an at-grade roadway (surface street). A portion of the bridge will remain, ramping up near Seminole Road and ramping down near Vallejo Street. This is part of a $935 million bond package proposed by Denver Mayor Mike Johnston.
- Status
- Prospective
- Sector
- Road, Bridge, Government
- Location
- Denver, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- BusinessDen
ConstructChat
Ask ConstructChat about Eighth Avenue Bridge Modification over Burnham Yard
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves removing the eastern portion of the two-lane Eighth Avenue bridge over Burnham Yard and the RTD tracks, converting that section into an at-grade roadway (surface street). A portion of the bridge will remain, ramping up near Seminole Road and ramping down near Vallejo Street. This is part of a $935 million bond package proposed by Denver Mayor Mike Johnston. |
Original sector | Government |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | BusinessDen |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
