Eirin Gas Field Development
Sector: Oil and Gas • Location: Norway
Source: Offshore Engineer Magazine
Equinor has started production at the Eirin gas field in the North Sea. The subsea development is tied back to the Gina Krog platform and was completed in about three years. The project is expected to recover around 27.6 million barrels of oil equivalent, mainly gas, and extend the economic life of the Gina Krog platform to 2036. Gas is exported to Europe via the Gina Krog and Sleipner A platforms
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Norway
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Eirin Gas Field Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Equinor has started production at the Eirin gas field in the North Sea. The subsea development is tied back to the Gina Krog platform and was completed in about three years. The project is expected to recover around 27.6 million barrels of oil equivalent, mainly gas, and extend the economic life of the Gina Krog platform to 2036. Gas is exported to Europe via the Gina Krog and Sleipner A platforms using existing infrastructure. |
Original sector | Energy |
Budget |
Location
Country | Norway |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
