Eisenhower ES Renovation Phase 2 - HVAC Replacement
Sector: Water Supply and Storage • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
Project consists of removing existing hot water radiation and unit ventilators. Replace existing hot water piping. Providing roof mounted energy recovery units with condensing units will be used to provide ventilation air to each space. The existing pneumatic temperature control system will be replaced with a direct digital control system. Architectural and Electrical work to include acoustical ce
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Education, Nuclear
- Location
- Minneapolis, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Eisenhower ES Renovation Phase 2 - HVAC Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project consists of removing existing hot water radiation and unit ventilators. Replace existing hot water piping. Providing roof mounted energy recovery units with condensing units will be used to provide ventilation air to each space. The existing pneumatic temperature control system will be replaced with a direct digital control system. Architectural and Electrical work to include acoustical ceiling panel replacement, floor polishing, light fixture replacement, marker board replacement, wa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Minneapolis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Education, Nuclear |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
