logo

Ekibastuz Power Station 2

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: World Bank Group

Project
Active

In October 2000, Kazakhstan and Russia had reached an agreement whereby Russia's UES would receive a 50% in the Ekibastuz State Regional Power Station 2 in Pavlodar -- the last power station not to be privatized -- to cancel out Kazakhstan's $300 million debt to UES for electricity supplies. Russia and Kazakhstan plan to eventually create a vertically integrated company called the Ural Heating and

Project Information FAQ

Project Information

4 Q
The project “Ekibastuz Power Station 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In October 2000, Kazakhstan and Russia had reached an agreement whereby Russia's UES would receive a 50% in the Ekibastuz State Regional Power Station 2 in Pavlodar -- the last power station not to be privatized -- to cancel out Kazakhstan's $300 million debt to UES for electricity supplies. Russia and Kazakhstan plan to eventually create a vertically integrated company called the Ural Heating and Energy Complex, which will unite several Russian power stations with Ekibastuz and two coal mines in north Kazakhstan. The Ekibastuz GRES - 2 power plant generated some 35 billion kw/h of electricity during the year 2000. It operates two energy blocks and ships power to consumers in southern Kazakhstan. On February 1, 2001, the GRES-2 officially became part of the Russian - Kazakhstani energy joint venture UralTEC. Unified Energy Systems (UES) Russia, also known as RAO UES Rossii, is owned by Russian government (53%), and foreign shareholders (33%). Following the power sector restructuring from 2003-2008 in Russia, the RAO UES no longer exists. It split into various subsidiaries among which is InterRAO UES which has been the holder of 50% stake in Ekibastuz since 2008. The other 50% stake in Ekibastuz GRES-2 is owned by AO "Sameruk-Energo", which is controlled by the government of the Republic of Kazakhstan. In June 2010, JSC Ekibastuz Gres-2 obatined two loans - a US$385 million and US$395.1 (RUB 12,000 million) loan from the Eurasian Development Bank SC Vnesheconombank maturing in 2025. The Company's shareholders issued guarantee to the banks at the amount of 50% of the two loans and the Company's Board of directors have pledged the shares of JSC Stantsiya Ekibastuzskaya GRES-2 as a collateral. The Company's liability under the guarantee and collateral is limited by 50% of the two loans obtained by the entity; the other 50% are to be guaranteed and collateralised in the same form by the other venturer, Samruk-Kazyn.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data