El Canada Hydroelectric Project
Sector: Tunnel • Location: Guatemala
Source: International Finance Corporation (IFC)
The El Canadá hydroelectric power project (El Canadá) is situated 12 kilometers south of Quetzaltenango municipality and approximately 200 kilometers west of Guatemala City. The Instituto Nacional de Electrificación (INDE) originally conceived the project in 1963 and the concept was thoroughly developed by Acres International Corporation (Acres) in 1992 for INDE. In 1999 Energía Global Internatio
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The El Canadá hydroelectric power project (El Canadá) is situated 12 kilometers south of Quetzaltenango municipality and approximately 200 kilometers west of Guatemala City. The Instituto Nacional de Electrificación (INDE) originally conceived the project in 1963 and the concept was thoroughly developed by Acres International Corporation (Acres) in 1992 for INDE. In 1999 Energía Global International, Ltd. (EGI), a Central America renewable power specialist, acquired development rights and all technical studies from Acres. El Canadá will be constructed immediately down-stream of and will divert tailrace from the existing 15.5 MW Santa Maria hydroelectric project on the Samalá River in western Guatemala, which was completed in 1925 to power an electric railway. Diverted tailrace from the older project will flow through a 1.5 Km tunnel 2.5 meters in diameter to an 180,000 m3 five-hour peaking reservoir. Water stored in the reservoir will flow to a powerhouse situated on the Samalá River approximately 400 m vertically below the diversion dam and produce 43 MW of electric power using two Pelton turbines. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
