logo

El Canada Hydroelectric Project

Sector: Tunnel • Location: Guatemala

Source: International Finance Corporation (IFC)

Project
Completed

The El Canadá hydroelectric power project (El Canadá) is situated 12 kilometers south of Quetzaltenango municipality and approximately 200 kilometers west of Guatemala City. The Instituto Nacional de Electrificación (INDE) originally conceived the project in 1963 and the concept was thoroughly developed by Acres International Corporation (Acres) in 1992 for INDE. In 1999 Energía Global Internatio

Project Information FAQ

Project Information

4 Q
The project “El Canada Hydroelectric Project” is an infrastructure initiative in the Tunnel sector, located in Guatemala. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The El Canadá hydroelectric power project (El Canadá) is situated 12 kilometers south of Quetzaltenango municipality and approximately 200 kilometers west of Guatemala City. The Instituto Nacional de Electrificación (INDE) originally conceived the project in 1963 and the concept was thoroughly developed by Acres International Corporation (Acres) in 1992 for INDE. In 1999 Energía Global International, Ltd. (EGI), a Central America renewable power specialist, acquired development rights and all technical studies from Acres. El Canadá will be constructed immediately down-stream of and will divert tailrace from the existing 15.5 MW Santa Maria hydroelectric project on the Samalá River in western Guatemala, which was completed in 1925 to power an electric railway. Diverted tailrace from the older project will flow through a 1.5 Km tunnel 2.5 meters in diameter to an 180,000 m3 five-hour peaking reservoir. Water stored in the reservoir will flow to a powerhouse situated on the Samalá River approximately 400 m vertically below the diversion dam and produce 43 MW of electric power using two Pelton turbines.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data