logo
ProjectClosed

EL CHOCON HYDRO POWE

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The El Chocon hydroelectric project on the Limay River in Northern Patagonia consists of a dam, a power house with three 200 MW generating units, and two 700 mile long transmission lines to Buenos Aires. The proposed Bank loan would finance the estimated foreign exchange cost of the main civil works contract, about to be placed with Impregilo of Italy after international competitive bidding; the c

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Government, Hydro
Location
Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EL CHOCON HYDRO POWE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EL CHOCON HYDRO POWE” is an infrastructure initiative in the Water Supply and Storage sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The El Chocon hydroelectric project on the Limay River in Northern Patagonia consists of a dam, a power house with three 200 MW generating units, and two 700 mile long transmission lines to Buenos Aires. The proposed Bank loan would finance the estimated foreign exchange cost of the main civil works contract, about to be placed with Impregilo of Italy after international competitive bidding; the cost of gates and penstocks to be procured in international competition with Argentine suppliers being allowed a preferential margin of 15 percent; foreign exchange payments to engineering consultants; and interest during construction on the Bank loan.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Argentina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project