El Estero Water Resource Ctr Electrical Distribution REBID
Sector: Water Supply and Storage • Location: Santa Barbara, California, United States of America
Source: Dodge USA
SCOPE OF WORK: Construct five (5) new concrete cast-in-place buildings, Installation of new electrical distribution equipment, Provide new electrical connections to existing electrical equipment. Installation of new electrical duct banks, Installation of new network communication equipment and infrastructure. Installation of a new fiber optic communication network, Relocation of existing flare con
- Status
- Closed
- Sector
- Water Supply and Storage, Broadband, Power Generation (CCGT), Telecommunications, Government, Cement, Commercial
- Location
- Santa Barbara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about El Estero Water Resource Ctr Electrical Distribution REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK: Construct five (5) new concrete cast-in-place buildings, Installation of new electrical distribution equipment, Provide new electrical connections to existing electrical equipment. Installation of new electrical duct banks, Installation of new network communication equipment and infrastructure. Installation of a new fiber optic communication network, Relocation of existing flare control panel to a new location, Installation of new digester gas piping. A digester gas shutdown wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Barbara |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Broadband, Power Generation (CCGT), Telecommunications, Government, Cement, Commercial |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
