El Llano Solar Power Plant
One of 10,000+ projects Taiyo tracks in Mexico.
Source: World Bank Group
The project involves the development of a 375 MW El Llano solar photovoltaic farm located 20km east of the town of Aguascalientes, state of Aguascalientes, central Mexico. Sponsor is Neoen SA (France). El Llano was one of the winners of the 3rd Mexican public renewable energy auction in November 2017. El Llano will sell around 70% of the electricity produced at a fixed price of $ 18.93/MWh to a co
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Raw Materials, Solar, Commercial, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about El Llano Solar Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a 375 MW El Llano solar photovoltaic farm located 20km east of the town of Aguascalientes, state of Aguascalientes, central Mexico. Sponsor is Neoen SA (France). El Llano was one of the winners of the 3rd Mexican public renewable energy auction in November 2017. El Llano will sell around 70% of the electricity produced at a fixed price of $ 18.93/MWh to a consortium consisting of Comisión Federal de Electricidad (CFE) SSB (a public body), Iberdrola Clientes and Menkent. The remainder of the electricity produced will be sold directly on the Mexican electricity market. The power purchasing contract is for 15 years for electricity and 20 years for clean energy certificates from activation date at the end of Q2 2020. It will be connected directly to CFE’s high-voltage network. Bancomext, Natixis and Société Générale are joint mandated lead arrangers, lenders, and bookrunners and will provide debt for total investment of $280 million (excluding financing costs.) Astris Finance, Norton Rose Fullbright, EOS, PwC, Deloitte, Pöyry, Beecher Carlson and Ester advised the project company on behalf of Neoen. Ritch, Mueller, SC, Shearman & Sterling, UL, Natura, KPMG and Mandy McNeil International advised the lenders. Financial close was announced on 19 March 2019. http://www.webdisclosure.com/finance/stocks/neoen-sa/news/847439.html |
Original sector | Energy |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Raw Materials, Solar, Commercial, Government |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
