El Platanal Hydroelectric Plant

Sector: Water Supply and Storage • Location: Peru

Source: World Bank Group

Project
Active

In September 2006, the consortium CELEPSA began constructing El Platanal, a 210 MW hydroelectric plant in the provinces of Yauyos and Canete in the department of Lima. El Platanal was to supply approximately 25% of its output to the consortium’s parent companies and the remaining 75% to Peru’s national grid. CELEPSA was formed by: Cementos Lima SA (Peru, 60%) Cemento Andino S.A. (Peru, 30%) and Co

Status
Prospective
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Hydro, Steel, Cement, Automotive
Location
Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about El Platanal Hydroelectric Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “El Platanal Hydroelectric Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In September 2006, the consortium CELEPSA began constructing El Platanal, a 210 MW hydroelectric plant in the provinces of Yauyos and Canete in the department of Lima. El Platanal was to supply approximately 25% of its output to the consortium’s parent companies and the remaining 75% to Peru’s national grid. CELEPSA was formed by: Cementos Lima SA (Peru, 60%) Cemento Andino S.A. (Peru, 30%) and Corporacion Aceros Arequipa SA (Peru, 10%). Compania Electrica El Platanal S.A., the special purpose vehicle, had the same shareholding as the consortium. In July 2001, the Peruvian federal government authorized Cementos Lima SA the concession to build, own and operate a hydroelectric and irrigation facility. The irrigation component was later taken out of the project plans and the hydroelectric facility was broken into two separate contracts for two separate plants: El Platanal (210 MW) and Morro de Arica (50 MW). Total project cost for El Platanal was estimated at US $220 million with 36 months granted for construction from September 2006. By December of 2007, significant construction progress had been made. The project was to be financed through a combination of debt and equity from the three project sponsors. Cementos Lima SA acted as the guarantor for a US $72 million out of a US $120 million line of credit from Banco de Credito del Peru obtained in 2005. The remainder of the cost was to be financed directly by the project sponsors. El Platanal was expected to become operational in the fourth quarter of 2009. El Platanal became operational in December 2009.

Original sector

Energy

Procurement method

Budget

Location

Country

Peru

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Hydro, Steel, Cement, Automotive

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project