logo

El Realito Aqueduct

Sector: Commercial • Location: Mexico

Source: World Bank Group

Project
Active

In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,40

Project Information FAQ

Project Information

5 Q
The project “El Realito Aqueduct” is an infrastructure initiative in the Commercial sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,400m3/day) water treatment plant, the 132km pipeline and three pumping stations. The associated dam and reservoir were part of a US$66.2 million public project built in conjunction with the El Realito PPP. Conoisa and Aqualia were subsidiaries of ICA [Mexico, 51%] and FCC [Spain, 49%], respectively. Aquos El Realito was formed as the project company. There were two other final bidders for the project Abengoa [Spain] and IDEAL [Mexico]. Bidding was based on the lowest NPV of payments. A fourth bidder, Makkro was disqualified. The winning bid was 2.71 billion pesos although the original budget was 2.38 billion pesos. The total project cost was US$214.8 million. In July 2011, Banco Santander was the sole lead arranger of US$97.04 million peso denominated syndicated loan with banks Banobras, Banorte and Bajio. The project received a US73.85 million capital grant from FONADIN backed by Banobras and US$43.9 million in equity from the sponsors. The ratio of debt to equity, not including the subsidy was 69:31. Operations commenced in June 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data