logo

El Realito Aqueduct

Sector: Water Supply and Storage • Location: Mexico

Source: World Bank Group

Project
Active

In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,40

Status
Prospective
Sector
Water Supply and Storage, Hydro, Waste Processing and Treatment, Government, Commercial
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about El Realito Aqueduct

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “El Realito Aqueduct” is an infrastructure initiative in the Water Supply and Storage sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,400m3/day) water treatment plant, the 132km pipeline and three pumping stations. The associated dam and reservoir were part of a US$66.2 million public project built in conjunction with the El Realito PPP. Conoisa and Aqualia were subsidiaries of ICA [Mexico, 51%] and FCC [Spain, 49%], respectively. Aquos El Realito was formed as the project company. There were two other final bidders for the project Abengoa [Spain] and IDEAL [Mexico]. Bidding was based on the lowest NPV of payments. A fourth bidder, Makkro was disqualified. The winning bid was 2.71 billion pesos although the original budget was 2.38 billion pesos. The total project cost was US$214.8 million. In July 2011, Banco Santander was the sole lead arranger of US$97.04 million peso denominated syndicated loan with banks Banobras, Banorte and Bajio. The project received a US73.85 million capital grant from FONADIN backed by Banobras and US$43.9 million in equity from the sponsors. The ratio of debt to equity, not including the subsidy was 69:31. Operations commenced in June 2015.

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Waste Processing and Treatment, Government, Commercial

Article published date

2024-09-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project