El Realito Aqueduct
Sector: Commercial • Location: San Luis Potosí, Mexico
Source: World Bank Group
In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,40
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Hydro, Government, Waste Processing and Treatment
- Location
- San Luis Potosí, Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about El Realito Aqueduct
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In July 2009, a consortium led by Conoisa and Aqualia was awarded a 25 year BOT contract to build, operate and maintain the El Realito Aqueduct water supply and purification system by the water commission of San Luis Potosi State in Mexico. The El Realito Aqueduct was to bring water to 132km from the El Realito dam on Rio Santa Maria to the city of San Luis Potosi and included a 1m3/second (86,400m3/day) water treatment plant, the 132km pipeline and three pumping stations. The associated dam and reservoir were part of a US$66.2 million public project built in conjunction with the El Realito PPP. Conoisa and Aqualia were subsidiaries of ICA [Mexico, 51%] and FCC [Spain, 49%], respectively. Aquos El Realito was formed as the project company. There were two other final bidders for the project Abengoa [Spain] and IDEAL [Mexico]. Bidding was based on the lowest NPV of payments. A fourth bidder, Makkro was disqualified. The winning bid was 2.71 billion pesos although the original budget was 2.38 billion pesos. The total project cost was US$214.8 million. In July 2011, Banco Santander was the sole lead arranger of US$97.04 million peso denominated syndicated loan with banks Banobras, Banorte and Bajio. The project received a US73.85 million capital grant from FONADIN backed by Banobras and US$43.9 million in equity from the sponsors. The ratio of debt to equity, not including the subsidy was 69:31. Operations commenced in June 2015. |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | Mexico |
State | San Luis Potosí |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Hydro, Government, Waste Processing and Treatment |
Article published date | 2024-05-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
