logo

El Zapotillo dam

Sector: Cement • Location: Mexico

Source: FCC Construction

Project
Closed

This project consists of the design and construction of the storage dam some 100 kilometres from Guadalajara, on the River Verde, in Jalisco, Mexico, for supplying potable water to Los Altos de Jalisco and the City of León (Mexico).This is a gravity-type dam, constructed of roller-compacted concrete, with a 401 metre curved base and crest and a height of 133 metres over the foundations. The dam bo

Project Information FAQ

Project Information

3 Q
The project “El Zapotillo dam” is an infrastructure initiative in the Cement sector, located in Mexico. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the design and construction of the storage dam some 100 kilometres from Guadalajara, on the River Verde, in Jalisco, Mexico, for supplying potable water to Los Altos de Jalisco and the City of León (Mexico).This is a gravity-type dam, constructed of roller-compacted concrete, with a 401 metre curved base and crest and a height of 133 metres over the foundations. The dam body is cemented some 28 metres under the actual river course.The river diversion is made on the right bank by means of a 120 square metre section that is 343 metres long.The reservoir covers 4,200 hectares and has a storage capacity of 910 cubic hectometres.The water travels 425 metres from the reservoir through a 5.4 metre diameter tunnel to PB1 pumping station, which then sends it 2.7 kilometres, raising the flow by 260 metres to PB2, which raises the water by 226 metres over 2.52 kilometres to the purification plant, where the water is treated.The reservoir produces 8.6 m3/s, of which 1.8 m3 are for Los Altos de Jalisco, 3.8 m3 for León and 3 m3 for Guadalajara.When purified, the water is taken 140 kilometres through a 2.4 metre diameter water pipeline to  the delivery point in León, a regulation tank holding 100,000 cubic metres, from which the water is then carried another 45 kilometres and distributed to ten tanks that supply the distribution network, which then takes it to the townsfolk.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data