logo

Elaine Drive Curbs

Sector: Cement • Location: St. Louis, Missouri, United States of America

Source: Dodge

Project
Closed

The Scope of Work consists of the installation of approximately 485 linear feet for concrete rolled curb and grading of approximately 120 linear feet of swale behind a portion of the curb. Traffic control and other incidental items shall be included as shown in the specifications

Status
Closed
Sector
Cement, Government, Commercial, Manufacturing (Industrial)
Location
St. Louis, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Elaine Drive Curbs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Elaine Drive Curbs” is an infrastructure initiative in the Cement sector, located in St. Louis, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Scope of Work consists of the installation of approximately 485 linear feet for concrete rolled curb and grading of approximately 120 linear feet of swale behind a portion of the curb. Traffic control and other incidental items shall be included as shown in the specifications

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

St. Louis

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Commercial, Manufacturing (Industrial)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project