Elam Creek Interceptor Sewer Replacement
Closed · Mississippi · Last reported Dec 2023
Source: Dodge USA
The work consists of the following approximate quantities: 7,150 LF of 18 gravity sewer line, 38 manholes, 3,700 LF of gravity sewer abandonment, 650 LF of bored steel encasement, 19 manhole abandonments, 975 CY of select borrow material, 320 CY of crushed stone, 390 SY of bituminous resurfacing, erosion control items, and related appurtenances.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Corinth, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elam Creek Interceptor Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the following approximate quantities: 7,150 LF of 18 gravity sewer line, 38 manholes, 3,700 LF of gravity sewer abandonment, 650 LF of bored steel encasement, 19 manhole abandonments, 975 CY of select borrow material, 320 CY of crushed stone, 390 SY of bituminous resurfacing, erosion control items, and related appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Corinth |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project