logo
ProjectBid Results

Elba - Runway Reconstruction

Bid results · Alabama · Last reported Jul 2025

Source: Dodge

Runway Reconstruction at Carl Folsom Airport (TMGM240031). Major items of work include: Elba Runway full depth repair, taxiway tie in, pavement removal, shoulder work, minor lighting reconfiguration, safety area grading, seeding and mulching

Status
Closed
Sector
Road, Airport, Manufacturing (Industrial), Government, Commercial
Location
Elba, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Elba - Runway Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Elba - Runway Reconstruction” is an infrastructure initiative in the Road sector, located in Elba, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Runway Reconstruction at Carl Folsom Airport (TMGM240031). Major items of work include: Elba Runway full depth repair, taxiway tie in, pavement removal, shoulder work, minor lighting reconfiguration, safety area grading, seeding and mulching

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Elba

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Airport, Manufacturing (Industrial), Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project