Elbow Road Extended Phase II-B and IIC REBID
Sector: Water Supply and Storage • Location: Virginia Beach, Virginia, United States of America
Source: Dodge USA
Construction of 1.3-mile, four-lane, divided roadway, with bike lanes, curb, gutter, wide sidewalk, noise barrier walls, storm drain structures, storm drainpipe, storm water ponds, 1,050-LF concrete bridge, traffic signals, fiber interconnect cable signage, pavement markings, LED street lighting and landscaping. Work also includes water main installation with a portion horizontal directionally dri
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Telecommunications, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial
- Location
- Virginia Beach, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Elbow Road Extended Phase II-B and IIC REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of 1.3-mile, four-lane, divided roadway, with bike lanes, curb, gutter, wide sidewalk, noise barrier walls, storm drain structures, storm drainpipe, storm water ponds, 1,050-LF concrete bridge, traffic signals, fiber interconnect cable signage, pavement markings, LED street lighting and landscaping. Work also includes water main installation with a portion horizontal directionally drilled (HDD) sub-aqueous crossing as well as other misc. water & sewer line relocations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Virginia Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Telecommunications, Waste Processing and Treatment, Car parking, Government, Automotive, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
