logo
ProjectOngoing

ELCO I: Solid Oxide Cell and Stack Manufacturing facility

One of 1,275 projects Taiyo tracks in Estonia.

Source: EU Funding & Tenders Portal

ELCO I: Solid Oxide Cell and Stack Pilot Manufacturing facility The project, located in Estonia, aims to establish a state-of-the-art manufacturing plant for solid oxide electrolyser cells (SOEC) with a production capacity of 360 MW. The project aims a 100% GHG relative emission avoidance compared with the reference scenario. ELCO I project incorporates several advanced manufacturing innovations.

Status
Under Construction
Sector
Manufacturing (Industrial), Hydrogen, Steel, Metal
Location
Estonia
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about ELCO I: Solid Oxide Cell and Stack Manufacturing facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “ELCO I: Solid Oxide Cell and Stack Manufacturing facility” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Estonia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ELCO I: Solid Oxide Cell and Stack Pilot Manufacturing facility The project, located in Estonia, aims to establish a state-of-the-art manufacturing plant for solid oxide electrolyser cells (SOEC) with a production capacity of 360 MW. The project aims a 100% GHG relative emission avoidance compared with the reference scenario. ELCO I project incorporates several advanced manufacturing innovations. The plant’s design includes an automated large batch mixer for paste preparation, roll-to-roll printing and continuous pusher furnaces for sintering, which optimise energy consumption during high-temperature firing processes. The plant also implements automated quality control using 3D microscopic scanning and AI-driven algorithms to detect and classify defects as small as 10 μm. The project plans to have an absolute GHG emissions avoidance of approximately 2 million tons of CO2e during its first 10 years of operation. The plant will be a critical step in achieving electrolyser gigawatt-scale production in Europe by 2030, significantly contributing to reducing the costs of green hydrogen production. As such, the project contributes to European renewable hydrogen production goals under RePowerEu and the Europe’s Hydrogen Strategy, also contributes considerably to achieving energy security and climate neutrality goals as ELCO I’s technology facilitates renewable hydrogen production and is pivotal in decarbonising hard-to-abate sectors like steel, fertiliser, and methanol production. It also contributes to strengthening European industrial manufacturing capacity under the Net-Zero Industry Act by supporting manufacturing capacity of electrolysers. ELCO I’s manufacturing facility aims to create approximately 300 new jobs, contributing to local employment and economic growth. The project’s emphasis on cutting-edge automation, quality control, and production efficiency will foster a strong and competitive clean-tech industry in the region.

Location

Country

Estonia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Hydrogen, Steel, Metal

Article published date

2025-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project