logo

ELCO I: Solid Oxide Cell and Stack Manufacturing facility

Sector: Manufacturing (Industrial) • Location: Estonia

Source: EU Funding & Tenders Portal

Project
Ongoing

ELCO I: Solid Oxide Cell and Stack Pilot Manufacturing facility The project, located in Estonia, aims to establish a state-of-the-art manufacturing plant for solid oxide electrolyser cells (SOEC) with a production capacity of 360 MW. The project aims a 100% GHG relative emission avoidance compared with the reference scenario. ELCO I project incorporates several advanced manufacturing innovations.

Project Information FAQ

Project Information

3 Q
The project “ELCO I: Solid Oxide Cell and Stack Manufacturing facility” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Estonia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ELCO I: Solid Oxide Cell and Stack Pilot Manufacturing facility The project, located in Estonia, aims to establish a state-of-the-art manufacturing plant for solid oxide electrolyser cells (SOEC) with a production capacity of 360 MW. The project aims a 100% GHG relative emission avoidance compared with the reference scenario. ELCO I project incorporates several advanced manufacturing innovations. The plant’s design includes an automated large batch mixer for paste preparation, roll-to-roll printing and continuous pusher furnaces for sintering, which optimise energy consumption during high-temperature firing processes. The plant also implements automated quality control using 3D microscopic scanning and AI-driven algorithms to detect and classify defects as small as 10 μm. The project plans to have an absolute GHG emissions avoidance of approximately 2 million tons of CO2e during its first 10 years of operation. The plant will be a critical step in achieving electrolyser gigawatt-scale production in Europe by 2030, significantly contributing to reducing the costs of green hydrogen production. As such, the project contributes to European renewable hydrogen production goals under RePowerEu and the Europe’s Hydrogen Strategy, also contributes considerably to achieving energy security and climate neutrality goals as ELCO I’s technology facilitates renewable hydrogen production and is pivotal in decarbonising hard-to-abate sectors like steel, fertiliser, and methanol production. It also contributes to strengthening European industrial manufacturing capacity under the Net-Zero Industry Act by supporting manufacturing capacity of electrolysers. ELCO I’s manufacturing facility aims to create approximately 300 new jobs, contributing to local employment and economic growth. The project’s emphasis on cutting-edge automation, quality control, and production efficiency will foster a strong and competitive clean-tech industry in the region.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data