logo

Eldorado Thermal Power Plant - Phase 1

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

Energética Eldorado Ltda, a wholly-owned subsidiary of the Brazilian company Companhia Eldorado de Agronegocios was granted an authorization by the regulatory agency ANEEL to build an 28-MW thermal power plant located in the state of Mato Grosso do Sul (municipality of Rio Brilhante). The cogeneration power plant was set to use sugar cane residues as fuel. Besides the cogeneration unit, the indus

Status
Prospective
Sector
Commercial, Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Eldorado Thermal Power Plant - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eldorado Thermal Power Plant - Phase 1” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Energética Eldorado Ltda, a wholly-owned subsidiary of the Brazilian company Companhia Eldorado de Agronegocios was granted an authorization by the regulatory agency ANEEL to build an 28-MW thermal power plant located in the state of Mato Grosso do Sul (municipality of Rio Brilhante). The cogeneration power plant was set to use sugar cane residues as fuel. Besides the cogeneration unit, the industrial complex was set to have a sugar-cane pressing facility and an ethanol producing unit. The 30-year contract for the UTE Eldorado was signed by Energetica Eldorado Ltda with ANEEL in October 2004, allowing the power plant to operate in the electricity market as an independent producer. UTE Eldorado began operations in 2006 and demanded investment of US$ 15.4 million (BRL 33.6 million). In March 2008, ETH Bioenergia, a subsidiary of the Brazilian group Odebrecht (66%) and the Japanese Sojitz Corporation (33%), paid US$ 382.5 million (BRL 700 million) for Eldorado pressing unit and cogeneration plant, and additional investment should be directed to its expansion (as of 2009, its capacity was of 12 MW). In August 2010, UTE Eldorado took part in a competitive bidding process to sell electricity to the regulated wholesale market (a 15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid).

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Manufacturing (Industrial), Power Generation (CCGT), Government

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project