Eldorado Thermal Power Plant - Phase 2

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Usina Eldorado S.A., a subsidiary of Odebrecht Agroindustrial (fomerly known as ETH Bioenergia - Odebrecht Group), was granted an authorization to build a 25-MW sugar-cane residue fueled power plant located in the state of Mato Grosso do Sul (municipality of Rio Brilhante). The power plant was named UTE Eldorado (ID# 5564).

In October 2004, the company signed a 30-year co

Status
Prospective
Sector
Biomass, Commercial, Power Generation (CCGT), Geothermal, Steel, Government, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Eldorado Thermal Power Plant - Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eldorado Thermal Power Plant - Phase 2” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Usina Eldorado S.A., a subsidiary of Odebrecht Agroindustrial (fomerly known as ETH Bioenergia - Odebrecht Group), was granted an authorization to build a 25-MW sugar-cane residue fueled power plant located in the state of Mato Grosso do Sul (municipality of Rio Brilhante). The power plant was named UTE Eldorado (ID# 5564). In October 2004, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate the power plant. The power plant commenced operations as a captive unit in 2006, but the new contract allowed the trade electricity also to large consumers in the unregulated market. Investment on the first phase was estimated at US$ 15.4 million. In August 2010, UTE Eldorado took part in a competitive bidding process to sell electricity to the regulated wholesale market (a 15-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). In October 2013, the company took part in another bidding process to establish 30-year power purchase agreements with electricity distribution companies. The company won the contracts by offering the tariff of US$ 39.7/MWh (BRL 132.3/MWh). The company committed to start supplying electricity to the regulated market by 2018. The power purchase agreement required the power plant to expand its capacity to 141 MW. The investment committed to the expansion was estimated at US$ 64.6 million (BRL 215.4 million). Construction works commenced in June 2014 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Commercial, Power Generation (CCGT), Geothermal, Steel, Government, Manufacturing (Industrial)

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project