logo
ProjectPlanned

Eldorado Valley Data Center Proposal

The owner, status and timeline of this project. A free account opens every field.

Source: Boulder City

A proposed data center to be located on city-owned land in the Eldorado Valley. The project aims to use its own resources for power and water, including an air-cooled cooling system and purchasing approximately 900,000 gallons of non-potable water for dust control. It will have its own fire suppression system and biodiesel generators for emergencies. The project is expected to create 200-300 high

Status
Prospective
Sector
Data Center, Biomass, Power Generation (CCGT), Water Supply and Storage
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
Boulder City

ConstructChat

Ask ConstructChat about Eldorado Valley Data Center Proposal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Eldorado Valley Data Center Proposal” is an infrastructure initiative in the Data Center sector, located in Boulder City, Nevada, United States. Taiyo aggregates data on it from Boulder City.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center to be located on city-owned land in the Eldorado Valley. The project aims to use its own resources for power and water, including an air-cooled cooling system and purchasing approximately 900,000 gallons of non-potable water for dust control. It will have its own fire suppression system and biodiesel generators for emergencies. The project is expected to create 200-300 high wage construction jobs and 25-40 permanent technical positions after completion.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

Boulder City

URL

More Details

Record type

Project

Sector

Data Center, Biomass, Power Generation (CCGT), Water Supply and Storage

Article published date

2026-04-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project