ELEC TRNS&CONSRVTN
Closed · Brazil
Source: World Bank Group
The objectives of the Electricity Transmission and Conservation Project are to: (i) optimize investment in the power sector; (ii) improve sector finances; (c) expand energy conservation and demand management programs; and (d) improve sector institutional arrangements. The project comprises the following components: (a) transmission investment and rehabilitation programs of selected power utilities
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ELEC TRNS&CONSRVTN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Electricity Transmission and Conservation Project are to: (i) optimize investment in the power sector; (ii) improve sector finances; (c) expand energy conservation and demand management programs; and (d) improve sector institutional arrangements. The project comprises the following components: (a) transmission investment and rehabilitation programs of selected power utilities for the period 1990-1993 including construction of transmission lines and installation of transformer capacity at power substations; and (b) Part A (1990-1991) of the National Electric Energy Conservation Program including works (installation of more efficient public lighting fixtures, loss reduction schemes), studies (load management, system loss reduction, improvement of efficiency industrial processes), research (improvement of electrical equipment performance, use of improved insulation material and construction technique for building/houses) and training. |
Original sector | Energy and Extractives |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Brazil
- Marlim Azul GasFired Power Plant Rio de Janeiro Brazil
- GNA II LNG Power Plant Rio de Janeiro Brazil
- It Hydroelectric Power Plant
- Lagoa do Barro Wind Complex Piaui
- Porto de Sergipe I Power Project Barra dos Coqueiros
- Governador Jos Richa Hydroelectric Plant Brazil
- Energisa Renascenca Wind Farm
- Delfina wind park expansion
