logo
ProjectInactive

Electribús Bogotá

One of 9,700 projects Taiyo tracks in Colombia.

Source: Inter-American Development Bank (IADB)

The Electribús Bogotá project (the "Project") seeks to finance the purchase of 13 50-passenger electric buses and 246 80-passenger electric buses, which will be put into operation in the Integrated Public Transport System (IPTS) of the city of Bogotá in Colombia. For this purpose, the Ashmore Andean Fund II, Fondo Ashmore Andino II, Somos Provisión SAS (the "Sponsors") have formed the Electribús B

Status
Closed
Sector
Mass Transit, Car parking, Energy Storage, Automotive, Manufacturing (Industrial)
Location
Colombia
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Electribús Bogotá

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electribús Bogotá” is an infrastructure initiative in the Mass Transit sector, located in Colombia. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Not available for this record.

Status

Original status

inactive

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Electribús Bogotá project (the "Project") seeks to finance the purchase of 13 50-passenger electric buses and 246 80-passenger electric buses, which will be put into operation in the Integrated Public Transport System (IPTS) of the city of Bogotá in Colombia. For this purpose, the Ashmore Andean Fund II, Fondo Ashmore Andino II, Somos Provisión SAS (the "Sponsors") have formed the Electribús Bogotá Usme I SAS, and Electribús Bogotá Fontibón II SAS (the "Concessionaires"), companies that have been awarded 15-year concession contracts that include the purchase and delivery of 133 and 126 buses, respectively. The buses purchased under this concession will be subsequently delivered to Empresa de Transporte del Tercer Milenio SA (TMSA), administrator of Bogota's mass transit system.The Project comprises only the purchase and supply of the fleet of electric buses by the Concessionaires to TMSA and does not include its operation or maintenance, as these tasks will be the responsibility of the Operation and Maintenance Concessionaires. Within this framework, the Concessionaires will be responsible for the purchase, supervision, and disengagement of the electric buses after the 15-year period, while the Operation and Maintenance Concessionaires (beyond the scope of this Operation) will be in charge of operating and maintaining the new fleet, and operating the parking and maintenance lots. For this purpose, a Private Agreement has been signed between each Concessionaire and the respective Operation and Maintenance Concessionaire, to regulate maintenance tasks, maintain the fleet enabled, and keep the factory guarantee of the units to be acquired in force.To enable the purchase of the vehicles, the Concessionaires have signed a Purchase Contract with BYD, a company that is actively present in the Colombian vehicle market, particularly in the public transport system. To date, BYD has 64 electric buses operating in the city of Medellín since November 2019.The Project will contribute to improving mobility in the city of Bogotá, while the introduction of a cleaner means of transport will help reduce emissions and air pollution. Once the purchase and commissioning of the vehicles is complete, Bogotá will become the city with the largest fleet of electric buses on the continent.[1]The total estimated cost of the Project is approximately 290,000 million Colombian Pesos ("COP"). This amount will be financed through a loan from the IDB Group, of which Proparco will guarantee 50% of the investment, a revolving loan to finance batteries from the United Kingdom Sustainable Infrastructure Program (UK SIP) Mixed Financing Fund administered by the IDB Group, the participation of Financiera de Desarrollo Nacional (FDN) and capital contributions from the sponsors of the Ashmore Andean Fund II Project, Ashmore Fondo Andino II, and Sistemas Operativos Móviles S.A.

Original sector

Transport

Budget

Location

Country

Colombia

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Mass Transit, Car parking, Energy Storage, Automotive, Manufacturing (Industrial)

Article published date

2025-12-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project