logo
ProjectPre-Design

Electric Boiler Plant (MP11)

Pre-design · British Columbia · Last reported Mar 2025

Source: Dodge

Lonsdale Energy Corp. will commission a 3-megawatt electric boiler plant in a new condo building, aiming to reduce annual greenhouse gas emissions by 1,300 tonnes.

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Manufacturing (Industrial), Road
Location
North Vancouver, British Columbia, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Electric Boiler Plant (MP11)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electric Boiler Plant (MP11)” is an infrastructure initiative in the Commercial sector, located in North Vancouver, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Lonsdale Energy Corp. will commission a 3-megawatt electric boiler plant in a new condo building, aiming to reduce annual greenhouse gas emissions by 1,300 tonnes.

Budget

Location

Country

Canada

State

British Columbia

City

North Vancouver

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Manufacturing (Industrial), Road

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project