logo

Electric Cooperative System Loss Reduction Project

Sector: Power Generation (CCGT) • Location: Philippines

Source: World Bank Group

Project
Closed

The Electric Cooperative Systems Loss Reduction Project will achieve significant, and sustained energy efficiency improvements in electric cooperatives (ECs), in order to provide customers with reliable, and least-cost power supply over the long term. The project will consist of two components - Partial Credit Guarantee Program, which includes eligible EC subproject investments, and the establish

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electric Cooperative System Loss Reduction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electric Cooperative System Loss Reduction Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Electric Cooperative Systems Loss Reduction Project will achieve significant, and sustained energy efficiency improvements in electric cooperatives (ECs), in order to provide customers with reliable, and least-cost power supply over the long term. The project will consist of two components - Partial Credit Guarantee Program, which includes eligible EC subproject investments, and the establishment of a Global Environment Facility (GEF)-funded partial credit guarantee facility to support such investments, and, - capacity building and implementation support for key stakeholders. The Partial Credit Guarantee Program will include a) provision of risk mitigation to lenders, thus to investor borrowers, to support energy efficiency investments; b) guarantees would leverage existing banking credit assessments expertise, share borrower credit risk with commercial lenders, and improve terms and access to loan financing, including the extension of maturities for borrowers; c) the guarantee coverage required would be determined by the nature of each investor EC, and status of the EC, as well as specific debt financing structure; and, d) the guarantee liabilities for a given transaction would be decreased over the life of the loan, in line with principal amortization schedule. Activities under the Capacity Building and Implementation Support component will include two Subcomponents: 1) the LGU Guarantee Corporation (LGUGC) subcomponent will provide technical assistance, training, study tours and workshops to LGUGC, financial intermediaries, selected ECs, and ECs investors, in power distribution systems, to strengthen LGUGC capacity; and, 2) provision of technical assistance to the Department of Energy (DOE) for implementation of periodic reporting, monitoring and evaluation of the credit guarantee program, as well as the assessment of energy efficiency gains of ECs from improved access to commercial lending. Capacity building within DOE would include technical assistance, training, study tours in procurement, and in energy regulation, operations and management practices.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project