Electric Power Emergency Reconstruction Project
One of 3,021 projects Taiyo tracks in Serbia.
Source: World Bank Group
The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mi
- Status
- Closed
- Sector
- Power Transmission, Geothermal, Power Generation (CCGT), Government
- Location
- Serbia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Electric Power Emergency Reconstruction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mining and Energy in preparing an Energy Policy Statement and drafting a new Energy Law. There are three project components. The first two components provide support for increasing available generating capacity through repairing the thermal power plant Kostalac A; and improving the reliability of the transmission network by reinforcing the transmission substation Sremska Mitrovica, which is key for importing electricity and reliably operating a high votage power grid. The third component funds the design, supply, and installation of a computer-based financial management system in EPS. An interim project specific financial management system has been established at EPS during the project's appraisal. This interim system will be incorporated into the new FMS. Additionally, the component provides technical assistance, specifically financing consulting services to the Serbian Ministry of Mining and Energy and to EPS: these services focus on reforming the energy sector legal and regulatory framework and on restructuring the energy market and sector enterprises. Auditing will also be funded. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Serbia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Geothermal, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
