logo
ProjectClosed

Electric Power Emergency Reconstruction Project

One of 3,021 projects Taiyo tracks in Serbia.

Source: World Bank Group

The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mi

Status
Closed
Sector
Power Transmission, Geothermal, Power Generation (CCGT), Government
Location
Serbia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electric Power Emergency Reconstruction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electric Power Emergency Reconstruction Project” is an infrastructure initiative in the Power Transmission sector, located in Serbia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mining and Energy in preparing an Energy Policy Statement and drafting a new Energy Law. There are three project components. The first two components provide support for increasing available generating capacity through repairing the thermal power plant Kostalac A; and improving the reliability of the transmission network by reinforcing the transmission substation Sremska Mitrovica, which is key for importing electricity and reliably operating a high votage power grid. The third component funds the design, supply, and installation of a computer-based financial management system in EPS. An interim project specific financial management system has been established at EPS during the project's appraisal. This interim system will be incorporated into the new FMS. Additionally, the component provides technical assistance, specifically financing consulting services to the Serbian Ministry of Mining and Energy and to EPS: these services focus on reforming the energy sector legal and regulatory framework and on restructuring the energy market and sector enterprises. Auditing will also be funded.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Serbia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Geothermal, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project