logo

Electric Power Emergency Reconstruction Project

Sector: Power Transmission • Location: Serbia

Source: World Bank Group

Project
Closed

The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mi

Project Information FAQ

Project Information

5 Q
The project “Electric Power Emergency Reconstruction Project” is an infrastructure initiative in the Power Transmission sector, located in Serbia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Electric Power Emergency Reconstruction Project for Yugoslavia aims to help restore relaible electricity supply in Serbia through urgent repairs of power facilities affected by the lack of maintenance and damage during the Kosovo conflict. Additional objectives are to improve the financial management system of the Electric Power Company of Serbia (EPS) and to support the Serbian Ministry of Mining and Energy in preparing an Energy Policy Statement and drafting a new Energy Law. There are three project components. The first two components provide support for increasing available generating capacity through repairing the thermal power plant Kostalac A; and improving the reliability of the transmission network by reinforcing the transmission substation Sremska Mitrovica, which is key for importing electricity and reliably operating a high votage power grid. The third component funds the design, supply, and installation of a computer-based financial management system in EPS. An interim project specific financial management system has been established at EPS during the project's appraisal. This interim system will be incorporated into the new FMS. Additionally, the component provides technical assistance, specifically financing consulting services to the Serbian Ministry of Mining and Energy and to EPS: these services focus on reforming the energy sector legal and regulatory framework and on restructuring the energy market and sector enterprises. Auditing will also be funded.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data