logo

Electric Power Project

Sector: Power Generation (CCGT) • Location: Myanmar

Source: World Bank Group

Project
Closed

The development objective of the Electric Power Project for Myanmar is to increase capacity and efficiency of gas-fired power generation and strengthen the institutional capacity of the Ministry of electric power and the Myanmar electric power enterprise. There are two components to the project. The first component of the project is supply and installation (S&I) of a Combined Cycle Gas Turbine (CC

Project Information FAQ

Project Information

5 Q
The project “Electric Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Myanmar. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Electric Power Project for Myanmar is to increase capacity and efficiency of gas-fired power generation and strengthen the institutional capacity of the Ministry of electric power and the Myanmar electric power enterprise. There are two components to the project. The first component of the project is supply and installation (S&I) of a Combined Cycle Gas Turbine (CCGT) power plant at the existing Thaton Gas Turbine (GT) station. This is the main component of the project is the expansion of the Thaton GT station into a new CCGT power plant. A modern, high-efficiency, low-emissions CCGT power plant will comprise two 40 Megawatt (MW) gas turbines with inlet air chillers, one steam turbine of 26 (MW), a heat recovery steam generator (HRSG) and air-cooled steam condenser. The second component of the project is technical assistance component focused on institutional and capacity building support to Ministry of Electric Power (MOEP) and Myanmar Electricity Power Enterprise (MEPE). This component will provide technical assistance and advisory services to MOEP and MEPE in two main areas. The first area of support is related to the capacity building for policy making and regulation in the power sector including.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data