logo

Electric Power Reconstruction 2 Project

Sector: Power Generation (CCGT) • Location: Bosnia and Herzegovina

Source: World Bank Group

Project
Closed

The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variation

Project Information FAQ

Project Information

5 Q
The project “Electric Power Reconstruction 2 Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variations in voltage level, and other quality of service defects. The secondary object is to improve cost recovery. The project components include: (a) rehabilitation of the hydropower stations of Rama, Jajce 1, Caplijina, Trebinje 1 and 2, and Bocac; and the coal-fired power stations of Tuzla (Second Phase), Kakanj (Second Phase), Gacko, and Uglejvik; (b) rehabilitation of transmission facilities in the Federation, Republika Srpska, and between them; (c) reconstruction and rehabilitation of distribution networks in the Federation and Republika Srpska; (d) rehabilitation of coal mines associated with the coal power stations of Tuzla, Kakanj, Gacko, and Uglejvik; and (e) technical assistance consisting of a transmission and institutional rehabilitation study, a coal sector restructuring study, and engineering and project management support.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data