Electric Power Reconstruction 2 Project
Sector: Power Generation (CCGT) • Location: Bosnia and Herzegovina
Source: World Bank Group
The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variation
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variations in voltage level, and other quality of service defects. The secondary object is to improve cost recovery. The project components include: (a) rehabilitation of the hydropower stations of Rama, Jajce 1, Caplijina, Trebinje 1 and 2, and Bocac; and the coal-fired power stations of Tuzla (Second Phase), Kakanj (Second Phase), Gacko, and Uglejvik; (b) rehabilitation of transmission facilities in the Federation, Republika Srpska, and between them; (c) reconstruction and rehabilitation of distribution networks in the Federation and Republika Srpska; (d) rehabilitation of coal mines associated with the coal power stations of Tuzla, Kakanj, Gacko, and Uglejvik; and (e) technical assistance consisting of a transmission and institutional rehabilitation study, a coal sector restructuring study, and engineering and project management support. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
