logo
ProjectClosed

Electric Power Reconstruction 2 Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variation

Status
Closed
Sector
Power Generation (CCGT), Government, Hydro
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electric Power Reconstruction 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electric Power Reconstruction 2 Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variations in voltage level, and other quality of service defects. The secondary object is to improve cost recovery. The project components include: (a) rehabilitation of the hydropower stations of Rama, Jajce 1, Caplijina, Trebinje 1 and 2, and Bocac; and the coal-fired power stations of Tuzla (Second Phase), Kakanj (Second Phase), Gacko, and Uglejvik; (b) rehabilitation of transmission facilities in the Federation, Republika Srpska, and between them; (c) reconstruction and rehabilitation of distribution networks in the Federation and Republika Srpska; (d) rehabilitation of coal mines associated with the coal power stations of Tuzla, Kakanj, Gacko, and Uglejvik; and (e) technical assistance consisting of a transmission and institutional rehabilitation study, a coal sector restructuring study, and engineering and project management support.

Original sector

Energy and Extractives

Budget

Location

Country

Bosnia and Herzegovina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project