Electric Power Reconstruction 2 Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variation
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Hydro
- Location
- Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Electric Power Reconstruction 2 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The primary objective of the Second Electric Power Reconstruction Project is to restore electric power supply at least cost. The project will help to restore the generation, transmission and distribution systems to meet at least part of the expect increase in demand within Bosnia and Herzegovina (BiH), reconnect many consumers still without power after the war, and reduce power outages, variations in voltage level, and other quality of service defects. The secondary object is to improve cost recovery. The project components include: (a) rehabilitation of the hydropower stations of Rama, Jajce 1, Caplijina, Trebinje 1 and 2, and Bocac; and the coal-fired power stations of Tuzla (Second Phase), Kakanj (Second Phase), Gacko, and Uglejvik; (b) rehabilitation of transmission facilities in the Federation, Republika Srpska, and between them; (c) reconstruction and rehabilitation of distribution networks in the Federation and Republika Srpska; (d) rehabilitation of coal mines associated with the coal power stations of Tuzla, Kakanj, Gacko, and Uglejvik; and (e) technical assistance consisting of a transmission and institutional rehabilitation study, a coal sector restructuring study, and engineering and project management support. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
