Electric Power Reconstruction 3 Project
Sector: Power Transmission • Location: Bosnia and Herzegovina
Source: World Bank Group
The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitates high voltage transmission network lines started under the Second Electric Power Reconstruction Project (report no. 20167). The second component finances reconstruction of key transmission substations. The third component establishes a supervisory control and data acquisition system and associated telecommunications facilities. The fourth component funds investments at hydropower stations to improve safety and availabilty. The fifth component makes investments in thermal power stations to control pollution. The sixth component supports distribution substation investments focusing on areas identified for refugee return, heavily damaged and cut-off areas which have little or no electricity supply, areas with war damage where many connections are of a temporary nature and power supply is unreliable and unsafe, and areas with seriously overloaded networks, due to refugee resettlement. The seventh component provides technical assistance and training in support of procurement and implementation of the physical components, among other sub-components. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
