The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitat

Project Information FAQ

Project Information

5 Q
The project “Electric Power Reconstruction 3 Project” is an infrastructure initiative in the Power Transmission sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitates high voltage transmission network lines started under the Second Electric Power Reconstruction Project (report no. 20167). The second component finances reconstruction of key transmission substations. The third component establishes a supervisory control and data acquisition system and associated telecommunications facilities. The fourth component funds investments at hydropower stations to improve safety and availabilty. The fifth component makes investments in thermal power stations to control pollution. The sixth component supports distribution substation investments focusing on areas identified for refugee return, heavily damaged and cut-off areas which have little or no electricity supply, areas with war damage where many connections are of a temporary nature and power supply is unreliable and unsafe, and areas with seriously overloaded networks, due to refugee resettlement. The seventh component provides technical assistance and training in support of procurement and implementation of the physical components, among other sub-components.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data