Source: World Bank Group
The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitat
- Status
- Closed
- Sector
- Power Transmission, Hydro, Geothermal, Power Generation (CCGT), Government
- Location
- Bosnia and Herzegovina
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Electric Power Reconstruction 3 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitates high voltage transmission network lines started under the Second Electric Power Reconstruction Project (report no. 20167). The second component finances reconstruction of key transmission substations. The third component establishes a supervisory control and data acquisition system and associated telecommunications facilities. The fourth component funds investments at hydropower stations to improve safety and availabilty. The fifth component makes investments in thermal power stations to control pollution. The sixth component supports distribution substation investments focusing on areas identified for refugee return, heavily damaged and cut-off areas which have little or no electricity supply, areas with war damage where many connections are of a temporary nature and power supply is unreliable and unsafe, and areas with seriously overloaded networks, due to refugee resettlement. The seventh component provides technical assistance and training in support of procurement and implementation of the physical components, among other sub-components. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Hydro, Geothermal, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Bosnia and Herzegovina
- Mercator BH d.o.o.
- ELECTRIC POWER RECONSTRUCTION II
- Low Enthalpy Geothermal ENergy Demonstration cases for Energy Efficient building in Adriatic area
- Innovative minds for smart schools
- Wool as Outstanding Opportunity for Leverage
- Schools Waste Less
- Enhancing competitiveness of olive production in the program area through cross border cooperation
- Pale District Heating Project