ProjectClosed

Electric Power Reconstruction 3 Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitat

Status
Closed
Sector
Power Transmission, Hydro, Geothermal, Power Generation (CCGT), Government
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electric Power Reconstruction 3 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electric Power Reconstruction 3 Project” is an infrastructure initiative in the Power Transmission sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project development objective of the Third Electric Power Reconstruction Project for Bosnia-Herzegovina is to continue the post-conflict reconstructtion program in the power sector and to ensure acess to reliable, lower cost electricity, to be supplied with reduced environmental and safety risks, and improved cost recovery by suppliers. There are seven project components. The first rehabilitates high voltage transmission network lines started under the Second Electric Power Reconstruction Project (report no. 20167). The second component finances reconstruction of key transmission substations. The third component establishes a supervisory control and data acquisition system and associated telecommunications facilities. The fourth component funds investments at hydropower stations to improve safety and availabilty. The fifth component makes investments in thermal power stations to control pollution. The sixth component supports distribution substation investments focusing on areas identified for refugee return, heavily damaged and cut-off areas which have little or no electricity supply, areas with war damage where many connections are of a temporary nature and power supply is unreliable and unsafe, and areas with seriously overloaded networks, due to refugee resettlement. The seventh component provides technical assistance and training in support of procurement and implementation of the physical components, among other sub-components.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Bosnia and Herzegovina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Hydro, Geothermal, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project