logo

ELECTRIC POWER

Sector: Water Supply and Storage • Location: Lebanon

Source: World Bank Group

Project
Closed

The Litani Power and Irrigation Project consists of: a) construction of the Karaoun dam on the Litani River and a reservoir; b) construction of the Bisri tunnel; c) construction of the Bisri penstock and power plant; d) construction of the Joun diversion dam and tunnel; e) construction of the Joun penstock and power plants; f) transmission lines and substations; and g) construction of irrigation w

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Tunnel, Commercial, Raw Materials, Government, Education
Location
Lebanon
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ELECTRIC POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRIC POWER” is an infrastructure initiative in the Water Supply and Storage sector, located in Lebanon. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Litani Power and Irrigation Project consists of: a) construction of the Karaoun dam on the Litani River and a reservoir; b) construction of the Bisri tunnel; c) construction of the Bisri penstock and power plant; d) construction of the Joun diversion dam and tunnel; e) construction of the Joun penstock and power plants; f) transmission lines and substations; and g) construction of irrigation works for 3400 ha between Saida and Beirut. The execution of the project presents difficult engineering and construction problems due to geological formations encountered, but these difficulties can be overcome if qualified engineers and contractors are employed. Firstly, the Saida - Beirut irrigation system will utilize the storage provided by the reservoir. This system should be financially self-supporting with reduce water rates it should make a substantial contribution to increase agricultural production. Secondly, this is essentially a power project and with an adequate market power should develop at a rate to justify the proposed installations. The project will produce power at nearly 20 percent less cost than would be obtained from thermal plants. This project will generate employment throughout the year and there will be further opportunity for indirect employment in commercial activities, contributing to the economic and social development of Lebanon.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Lebanon

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Tunnel, Commercial, Raw Materials, Government, Education

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project