logo
ProjectClosed

Electric Utility Construction

Closed · Arizona · Last reported Jul 2025

Source: Dodge

4.The Contractor(s) shall furnish all labor, materials, tools, equipment, supervision, and incidentals necessary to perform the following services. A.General Services: Comprehensive construction, installation, maintenance, and repair services for all components of the electric distribution system, including overhead and underground systems up to sixty-nine (69) kV. Pole replacements, including rem

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Mesa, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Electric Utility Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electric Utility Construction” is an infrastructure initiative in the Power Transmission sector, located in Mesa, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

4.The Contractor(s) shall furnish all labor, materials, tools, equipment, supervision, and incidentals necessary to perform the following services. A.General Services: Comprehensive construction, installation, maintenance, and repair services for all components of the electric distribution system, including overhead and underground systems up to sixty-nine (69) kV. Pole replacements, including removal, setting, framing, tamping, and grounding for new or replacement poles. Installation, mainte...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Mesa

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project