Electric Vehicle Charging Infrastructure
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Professional services for Electric Vehicle Charging Infrastructure. The Los Angeles Unified School District (District or LAUSD) seeks proposals from qualified firms to provide locations for existing, planned or future EV charging infrastructure that our bus fleet can utilize. Professional services for Electric Vehicle Charging Infrastructure. The Los Angeles Unified School District (District or LA
- Status
- Closed
- Sector
- Government, Power Transmission, Commercial, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Electric Vehicles (EVs)
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Electric Vehicle Charging Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Professional services for Electric Vehicle Charging Infrastructure. The Los Angeles Unified School District (District or LAUSD) seeks proposals from qualified firms to provide locations for existing, planned or future EV charging infrastructure that our bus fleet can utilize. Professional services for Electric Vehicle Charging Infrastructure. The Los Angeles Unified School District (District or LAUSD) seeks proposals from qualified firms to provide locations for existing, planned or future EV... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Power Transmission, Commercial, Automotive, Power Generation (CCGT), Manufacturing (Industrial), Electric Vehicles (EVs) |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
