Electric Vehicle Charging Stations Install
Sector: Automotive • Location: Brockton, Massachusetts, United States of America
Source: Dodge USA
The Brockton Area Transit Authority (BAT) is soliciting bids from qualified firms to furnish and install Electric Vehicle Charging Stations and Related Electrical and Site Infrastructure for the BAT heavy duty transit fleet
- Status
- Closed
- Sector
- Automotive, Electric Vehicles (EVs), Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- Brockton, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Electric Vehicle Charging Stations Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brockton Area Transit Authority (BAT) is soliciting bids from qualified firms to furnish and install Electric Vehicle Charging Stations and Related Electrical and Site Infrastructure for the BAT heavy duty transit fleet |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brockton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
