Electric Vehicle Charging Stations Install
Sector: Power Generation (CCGT) • Location: Bakersfield, California, United States of America
Source: Dodge USA
Furnish Labor and Material to Install (6) EV Charging Stations. DHS will Provide 6 Chargers. 2. Furnish Service for underground bore and conduit install for EV Chargers. 3. Furnish and Install Bollards at EV Charger locations for Mounting equipment. 4. Furnish and Install Outdoor, Lockable enclosures for EV Chargers. 5. Provide Asphalt patch back when underground installation is complete. 6. Provi
- Status
- Closed
- Sector
- Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial, Road, Government, Electric Vehicles (EVs)
- Location
- Bakersfield, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Electric Vehicle Charging Stations Install
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnish Labor and Material to Install (6) EV Charging Stations. DHS will Provide 6 Chargers. 2. Furnish Service for underground bore and conduit install for EV Chargers. 3. Furnish and Install Bollards at EV Charger locations for Mounting equipment. 4. Furnish and Install Outdoor, Lockable enclosures for EV Chargers. 5. Provide Asphalt patch back when underground installation is complete. 6. Provide scheduling with PG&E for service upgrade. 7. Furnish labor to de-energize system (LOTO) to ens... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bakersfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial, Road, Government, Electric Vehicles (EVs) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
