Electric Vehicle Charging Stations
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Electric Vehicle Charging Station 3 EA Bollard 10 EA Handhole 1 EA Traffic Control 1 LS Remove Concrete Walk/Driveway Pavement 300 SF Sediment Control Log Type Compost 60 LF 4 Concrete Walk 220 SF Common Topsoil Borrow 10 CY 7 Concrete Valley Gutter 7 SY Turf Establishment 1 LS
- Status
- Closed
- Sector
- Road, Automotive, Power Generation (CCGT), Commercial, Electric Vehicles (EVs), Manufacturing (Industrial), Government, Cement
- Location
- Saint Peter, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Electric Vehicle Charging Stations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electric Vehicle Charging Station 3 EA Bollard 10 EA Handhole 1 EA Traffic Control 1 LS Remove Concrete Walk/Driveway Pavement 300 SF Sediment Control Log Type Compost 60 LF 4 Concrete Walk 220 SF Common Topsoil Borrow 10 CY 7 Concrete Valley Gutter 7 SY Turf Establishment 1 LS |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Peter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Automotive, Power Generation (CCGT), Commercial, Electric Vehicles (EVs), Manufacturing (Industrial), Government, Cement |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
