ELECTRICAL 10 French ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Furnish and install 2-pole 80AMurray circuit breaker(already confirmed the wire size feeding the sub-panel is rated for 100A and customer doesn’t have any big appliances that would cause concern for overload Furnish and install wiring and over current protection for 50A circuit from sub-panel in kitchen through attic access to new location of customer supplied EV charger for customers electrical v
- Status
- Prospective
- Sector
- Road, Electric Vehicles (EVs), Automotive, Commercial, Government
- Location
- Mattapan, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 10 French ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Furnish and install 2-pole 80AMurray circuit breaker(already confirmed the wire size feeding the sub-panel is rated for 100A and customer doesn’t have any big appliances that would cause concern for overload Furnish and install wiring and over current protection for 50A circuit from sub-panel in kitchen through attic access to new location of customer supplied EV charger for customers electrical vehicle on driveway side of house(have to changeover to PVC on outside of house to bring wiring down from attic on outside of house). Furnish and install 50A weatherproof enclosure with 2-pole 50A GFCI breaker before EV charger for means of disconnect for EV charger. Install and mount customer supplied 50A Pulsar Plus EV charger. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapan |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Electric Vehicles (EVs), Automotive, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
