ELECTRICAL 100 Cambridge ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
- Provide and install a 2” conduit nipple between 6160 & B160.
- Install (2) 3/0 battery cables in 2” conduit between 6160 & B160. (Battery Cables supplied by others)
- Provide and install a 2” conduit nipple & (3) CAT 6 for alarms between 6160 & B160. (Temp sensor cable provided by others)
- Provide and install a 2” conduit with (2) #1 THHN’s & (1) #6 THHN & (3) #12 THHN’s between 6160 & PPC
- Status
- Prospective
- Sector
- Energy Storage, Advanced Electronics, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 100 Cambridge ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 1. Provide and install a 2” conduit nipple between 6160 & B160. 2. Install (2) 3/0 battery cables in 2” conduit between 6160 & B160. (Battery Cables supplied by others) 3. Provide and install a 2” conduit nipple & (3) CAT 6 for alarms between 6160 & B160. (Temp sensor cable provided by others) 4. Provide and install a 2” conduit with (2) #1 THHN’s & (1) #6 THHN & (3) #12 THHN’s between 6160 & PPC. 5. Provide and install a new a 1 pole 20A breaker & a 2 pole 125A breaker for new 6160 cabinet. 6. Provide and install a 1” conduit between 6102 & 6160. 7. Provide and install a 2” conduit between AAV and 6160. 8. Provide and install a 2” conduit with (2) #1 THHN’s & (1) #6 THHN between 6102 & PPC. 9. Provide and install a 2 pole 125A breaker for 6102 upgrade. 10. Provide and install (2) 2” conduits between 6102 & 6160. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Advanced Electronics, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
